Installation

Installation Guide

STEP 1

Complete the framework

  • Attach battens, noggins or metal furring strips for support, ensuring they are level and evenly spaced (450mm or 600mm spacing is recommended)
  • Attach the starter/side channel if necessary.
STEP 2

Measure the cladding panels to fit the installation area.

  • Use appropriate tools (e.g., angle grinder or a circular saw with a metal blade) to cut panels as required.
STEP 3

Tongue & groove system - start from one corner or bottom edge.

  • Fix the first panel using screws or nails. The screws should go through the tongue of the panel (it is recommended to fix a screw every 600mm).
  • Then align the groove of the second panel with the tongue of the first panel.
STEP 4

Place each new panel tightly against the previous one.

  • Ensure proper interlocking of both panels (tongue-and-groove system).
  • Continue fixing panels securely while checking alignment.
  • Seal joints and edges if required.
STEP 5

Apply sealant or flashing where necessary to prevent water penetration and for a better finish.

  • Cover exposed edges with trims or angles for a finished look.
  • Ensure the core insulation is not exposed to water for durability.

TRANSFORM YOUR SPACE

Ready to elevate your home or project? Contact us today for a free, no-obligation consultation on ceilings, walls, and facades.
Let's Talk
Sen: 0420 500 852
Angus: 0422 391 719
Address
Unit 13, 2 Playle Street, Myaree. WA 6154
Copyright
© 2026 Cladtech Pty Ltd
Scroll to Top